All engineering gates remain pending. This updates the release documents to reflect the current integration-pending status after PR #6 merged.
93 lines
2.2 KiB
Markdown
93 lines
2.2 KiB
Markdown
# V1R4C6 Release Gate Status
|
|
|
|
Date: 2026-07-11
|
|
|
|
Status: integration pending — release-candidate control artifacts merged, engineering gates not yet executed
|
|
|
|
## Completed
|
|
|
|
- V1R4C5 baseline verified as active base.
|
|
- GitOps API and public API return:
|
|
- current_baseline: V1R4C5
|
|
- previous_baseline: V1R4C3
|
|
- git: a32c76a3c1baa49562e53fb8adce10a5ed0e6704
|
|
- GitOps bare repository path corrected to active `aios.git`.
|
|
- V1R4C6 merge matrix created.
|
|
- V1R4C6 acceptance checklist created.
|
|
- V1R4C6 acceptance evidence created.
|
|
- PR #6: control artifacts merge — PASS
|
|
|
|
## Result Summary
|
|
|
|
| Item | Status |
|
|
|-------------------------|-----------|
|
|
| control artifacts merge | PASS |
|
|
| Gate A | NOT RUN |
|
|
| Gate B | NOT RUN |
|
|
| Gate C | NOT RUN |
|
|
| tests | NOT RUN |
|
|
| artifact | NOT CREATED |
|
|
| deployment | NOT RUN |
|
|
| production verification | NOT RUN |
|
|
| tag created | NO |
|
|
| baseline promoted | NO |
|
|
| memory search enabled | NO |
|
|
| **overall** | **BLOCKED / INTEGRATION PENDING** |
|
|
|
|
## Verified Artifact
|
|
|
|
- **PR #6 merge commit**: `ae49bf0fa35b0f599a96a4d12644576447f39cec`
|
|
- **Current baseline**: V1R4C5
|
|
- **V1R4C6 tag**: absent
|
|
- **Memory search**: disabled
|
|
- **Force-push**: disabled
|
|
|
|
## Remaining Gates (not yet executed)
|
|
|
|
### Gate A — Admin Workbench / Portal AIOS
|
|
|
|
- merge candidate review;
|
|
- RBAC acceptance;
|
|
- task progress visibility;
|
|
- flow diagram visibility;
|
|
- health/observability validation.
|
|
|
|
### Gate B — SR-03 Search Gateway
|
|
|
|
- provider binding validation;
|
|
- scope-before-ranking validation;
|
|
- provenance validation;
|
|
- fallback validation.
|
|
|
|
### Gate C — Agent Platform
|
|
|
|
- event scope validation;
|
|
- message plane scope validation;
|
|
- dispatch safe-mode validation;
|
|
- owner gate validation.
|
|
|
|
## Release Stop Point
|
|
|
|
After Gates A/B/C pass:
|
|
|
|
```text
|
|
prepare V1R4C6 tag
|
|
↓
|
|
owner confirmation required
|
|
↓
|
|
tag creation
|
|
↓
|
|
baseline promotion
|
|
```
|
|
|
|
## Hard Constraints
|
|
|
|
Remain:
|
|
|
|
```text
|
|
AIOS_MEMORY_ENABLED=false
|
|
memory search disabled
|
|
force-push forbidden
|
|
gitea DB mutation requires owner approval
|
|
```
|